SHOWING OUR WORK
Useful ranges.
Visible assumptions.
This is an early budgeting tool. It is not a database of local contractor bids, an appraisal, or a heating-and-cooling load calculator.
Published reference ranges
Source reviewed September 30, 2026: Carrier replacement cost guide. These figures cover equipment and standard installation across a broad range of projects.
| Equipment | Reference range |
|---|---|
| Central air conditioner | $3,000–$15,000 |
| Gas furnace | $3,800–$12,000 |
| Air-source heat pump | $6,000–$25,000 |
| AC + gas furnace | $6,800–$27,000* |
*Our sum of the two separate ranges, not a published combined-system average. Shared work may affect a bundled price.
The calculation
Low end = selected low × number of systems + additional-work low.
High end = selected high × number of systems + additional-work high.
The two-system option assumes two similar replacement scopes. The allowance is added once per project. Scope alone never adds an invented surcharge. Additional work uses a low and high allowance that you supply. Unless you confirm all required work is included, the result is labeled a priced subtotal. Unknown scope always remains a subtotal.
What the result does not include automatically
No local-price multiplier, financing charges, tax credits, rebates, energy savings, taxes or nonstandard work are calculated separately. Check what each written quote includes. A zero allowance leaves unpriced work unresolved. No percentile or confidence interval is implied.
Two ways to narrow the starting range
The manufacturer mode uses specific equipment examples from Trane’s pricing guide, reviewed September 30, 2026. Basic installation is included; tax and project-specific work may be excluded. These are examples from one brand, not measured local market bounds. Confirm indoor equipment and accessory inclusion with the installer. There is no combined-system benchmark in this mode.
The written-bounds mode uses your documented low and high for the same scope, per system. We cannot validate that evidence. Different equipment or exclusions make those bounds incomparable. Additional-work amounts apply to the entire project, once. We round the final low down and high up to the nearest $100. Ranges are not probability intervals.
Comparing a quote
When you confirm required work is priced, we only identify whether your entered total lies below, within or above the reference range. That is not a fairness score or a recommendation to accept or reject the contractor.
How we will improve this
Local price estimates require permissioned, dated, itemized project evidence. Until that evidence exists, we will not label national ranges as city-specific prices. Equipment sizing should be supported by a professional load calculation; see ACCA Manual J.